Our 8 DIY Steps & Packaged Solutions

Pool Builder Packages

Step 1: Dream & Inspiration

  1. Select the pool images you like.
  2. Select your desired Pool Features.
  3. Align your pool concept with your budget.

Step 2: Design

  • Provide property survey and backyard photos.
  • Develop 3D Rendition.
  • Align rendition with your budget.

Step 3: Construction Plans

  • Call 811 and take photos of utility location flags.
  • Create a construction plan per city code.
  • Send construction plan to City and HOA.

Step 4: Engineering

  • Prep for engineering needs.
  • Develop engineering layout.
  • Align engineering with construction plans.

Step 5: Survey-811-Permit-HOA

  • Package survey, 811, construction, engineering, and send to your City.
  • Package survey, 811, construction, engineering, and send to your HOA.
  • Respond to any HOA and City questions.

Step 6: Sub Contractors

  • Identify potential Sub Contractors.
  • Select preferred Sub Contractors.
  • Schedule Sub Contractors.

Step 7: Construction

  • Schedule / Inspect: Dig, steel, bonding, plumbing, equipment.
  • Schedule / Inspect: Electric utilities, gas utilities.
  • Schedule / Inspect: Tile, coping, decking.

Step 8: Startup

  • Schedule / Inspect: Plaster and fill.
  • Startup maintenance / brushing
  • Balance chemicals and swim!
Easysoftonic

Live Webinar This Thursday

X